Temporary Fencing SWMS

Save time with this 2019 compliant Ready To Sign SWMS document that’s been pre-filled with work activities and risks.

Temporary Fencing SWMS

Download this customised SWMS document in 5 minutes.

Temporary Fencing

Word + PDF

Full 12 Month

Change Guarantee

What’s included

Below is a preview of just one of many work activities included in this SWMS document.

WORK ACTIVITIES

1.
2.
3.
4.
5.Installation of Fence

Hazards Present

  • Manual handling, sprains and strains.
  • Physical injuries such as: shoulder and back injuries, possible damage to knees and hip joints, feet etc.
  • Sunburn & protective wear.

Risk Control Measures

  • Use controls as described above for lifting blocks 2 persons to lift panels and put into.
  • Install braces / pegs progressively as the fence is being installed.
  • Install any shade cloth, signage or other wind catches only after all necessary bracing is in place
  • Panels should be clamped securely at all times and secured to provide maximum strength and support to the system.
  • Ensure all equipment is placed 4meters away from power lines.
  • Load rating of at least 120kg and to be manufactured for industrial use.
  • Ensure that all power tools are in safe reach and away from hazardous substance.
  • Secure all equipment from top to bottom to prevent movement.
  • Ensure a minimum of 1meter above the area being accessed.
  • Should a gate be required, one block and clamp needs to be left out, thus enabling the two panels to swing freely, acting as a gate. The leaf of the gate should be secured to a number of panels to provide maximum strength and support.
6.
7.

Hazards Present

  • Manual handling, sprains and strains.
  • Physical injuries such as: shoulder and back injuries, possible damage to knees and hip joints, feet etc.
  • Sunburn & protective wear.

Risk Control Measures

  • Use controls as described above for lifting blocks 2 persons to lift panels and put into.
  • Install braces / pegs progressively as the fence is being installed.
  • Install any shade cloth, signage or other wind catches only after all necessary bracing is in place
  • Panels should be clamped securely at all times and secured to provide maximum strength and support to the system.
  • Ensure all equipment is placed 4meters away from power lines.
  • Load rating of at least 120kg and to be manufactured for industrial use.
  • Ensure that all power tools are in safe reach and away from hazardous substance.
  • Secure all equipment from top to bottom to prevent movement.
  • Ensure a minimum of 1meter above the area being accessed.
  • Should a gate be required, one block and clamp needs to be left out, thus enabling the two panels to swing freely, acting as a gate. The leaf of the gate should be secured to a number of panels to provide maximum strength and support.

Order with confidence

As Australia's leading SWMS provider, we guarantee your SWMS to be legally compliant and job ready.

Instant download

Industry leading simple and easy SWMS documents. Simply find the document you need, complete the checkout and have the documents instantly.

Work activities & risks

We have hundreds of pre-filled SWMS with work activities and risks for instant download. Use our self-serve download if you know which document you need or contact a specialist to build a complete compliancy package.

Australian support

Need help? Please call our dedicated support number to speak with a SWMS specialist. If outside of business hours, please use our contact form.

Word & PDF documents

Each SWMS is delivered instantly to your email in both the customised PDF and original MS Word format to allow the flexibility of any changes.

Customised logo

Look professional by having your company's logo shown. Simply upload your logo in the checkout process to complete the customisation.

What you’ll need

Having helped thousands of businesses, we've made getting compliant extremely easy.

Know which SWMS you need

Our growing self-serve SWMS library is designed to help businesses build compliance quickly.

Your business name

We connect with ABR.gov.au to help make it easier to fill out your business information.

Your logo to upload

Add your logo to the SWMS documents and look professional.

Easy to follow instructions

Our documents are designed to be easy to use. Here's a preview of just how simply it is.

See what our customers say

Helping Australian businesses solve WHS compliance quickly and easily.

24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
Previous
Next

Need help?

If your SWMS requires special conditions as part of a tender, you need our Full Compliance Solutions See our Full Compliance

Our SWMS are used on these Tier-1 sites

Instant quote

Fill out your information

Instant quote

Temporary Fencing SWMS

Download this customised SWMS document in 5 minutes.