SWMS Document

Mobile Plant Operating Roller SWMS

Save time with this 2019 compliant Ready To Sign SWMS document that’s been pre-filled with work activities and risks.

Mobile Plant Operating Roller SWMS

Download this customised SWMS document in 5 minutes.

Mobile Plant Operating Roller

Word + PDF

Full 12 Month

Change Guarantee

What’s included

Below is a preview of just one of many work activities included in this SWMS document.

WORK ACTIVITIES

1.
2.
3.
4.
5.Delivery and Removal of Mobile Plant

Hazards Present

  • Crush Injuries
  • Entrapment

Risk Control Measures

  • Ensure the vehicle/trailer used to transport the mobile plant is appropriate –weight and size.
  • Tie down points are identified by tie down decals where required
  • Use designated tie-down points on plant if provided (see operations manual)
  • Do not attach tie down accessories around hydraulic cylinders or in any way that may damage hoses or hydraulic components
  • Ensure machine is stabilised before travel
  • Verify all tie down equipment (chains, shackles etc.) is rated for the task and fixed in such a way to prevent movement during transit.
  • Ramps
  • Suitable load capacity for weight of plant, wide enough, foot boards on the side
  • Lock ramps in place, use locking pin/clips if required
  • Assess ground conditions at loading/unloading site to determine forward or reverse loading
  • Ensure clear of obstructions; tree branches, structures/overhead electric lines
  • Ensure persons are clear of loading/unloading site
  • Ensure bucket is in lowest position possible to remain stabilised

To load / unload:

  • Apply handbrake and block tow/transport vehicle wheels
  • Load / unload as per manufacturer’s instructions
  • Mobile plant is loaded/unloaded to and from the vehicle whilst on level ground
  • Aligned for loading/unloading and positioned with the vehicle by a suitably qualified, competent and experienced operator
  • Ensure mobile plant is adequately restrained to prevent movement during transit.
6.
7.

Hazards Present

  • Crush Injuries
  • Entrapment

Risk Control Measures

  • Ensure the vehicle/trailer used to transport the mobile plant is appropriate –weight and size.
  • Tie down points are identified by tie down decals where required
  • Use designated tie-down points on plant if provided (see operations manual)
  • Do not attach tie down accessories around hydraulic cylinders or in any way that may damage hoses or hydraulic components
  • Ensure machine is stabilised before travel
  • Verify all tie down equipment (chains, shackles etc.) is rated for the task and fixed in such a way to prevent movement during transit.
  • Ramps
  • Suitable load capacity for weight of plant, wide enough, foot boards on the side
  • Lock ramps in place, use locking pin/clips if required
  • Assess ground conditions at loading/unloading site to determine forward or reverse loading
  • Ensure clear of obstructions; tree branches, structures/overhead electric lines
  • Ensure persons are clear of loading/unloading site
  • Ensure bucket is in lowest position possible to remain stabilised

To load / unload:

  • Apply handbrake and block tow/transport vehicle wheels
  • Load / unload as per manufacturer’s instructions
  • Mobile plant is loaded/unloaded to and from the vehicle whilst on level ground
  • Aligned for loading/unloading and positioned with the vehicle by a suitably qualified, competent and experienced operator
  • Ensure mobile plant is adequately restrained to prevent movement during transit.

Order with confidence

As Australia's leading SWMS provider, we guarantee your SWMS to be legally compliant and job ready.

Instant download

Industry leading simple and easy SWMS documents. Simply find the document you need, complete the checkout and have the documents instantly.

Work activities & risks

We have hundreds of pre-filled SWMS with work activities and risks for instant download. Use our self-serve download if you know which document you need or contact a specialist to build a complete compliancy package.

Australian support

Need help? Please call our dedicated support number to speak with a SWMS specialist. If outside of business hours, please use our contact form.

Word & PDF documents

Each SWMS is delivered instantly to your email in both the customised PDF and original MS Word format to allow the flexibility of any changes.

Customised logo

Look professional by having your company's logo shown. Simply upload your logo in the checkout process to complete the customisation.

What you’ll need

Having helped thousands of businesses, we've made getting compliant extremely easy.

Know which SWMS you need

Our growing self-serve SWMS library is designed to help businesses build compliance quickly.

Your business name

We connect with ABR.gov.au to help make it easier to fill out your business information.

Your logo to upload

Add your logo to the SWMS documents and look professional.

Easy to follow instructions

Our documents are designed to be easy to use. Here's a preview of just how simply it is.

See what our customers say

Helping Australian businesses solve WHS compliance quickly and easily.

24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
Previous
Next

Need help?

If your SWMS requires special conditions as part of a tender, you need our Full Compliance Solutions See our Full Compliance

Our SWMS are used on these Tier-1 sites

Instant quote

Fill out your information

Instant quote

Mobile Plant Operating Roller SWMS

Download this customised SWMS document in 5 minutes.