SWMS Document

Electrical (Temporary Connections) SWMS

Save time with this 2019 compliant Ready To Sign SWMS document that’s been pre-filled with work activities and risks.

Electrical (Temporary Connections) SWMS

Download this customised SWMS document in 5 minutes.

Electrical (Temporary Connections)

Word + PDF

Full 12 Month

Change Guarantee

What’s included

Below is a preview of just one of many work activities included in this SWMS document.

WORK ACTIVITIES

1.
2.
3.
4.
5.Use of Generators

Hazards Present

  • Fire / explosion.
  • Hazardous atmospheres
  • Electric shock / electrocution

Risk Control Measures

Ensure location is suitable for generator:

  • Clear of ignition sources
  • Ensure unit is able to be placed in safe location clear of flammables goods
  • Always operate generator in a well-ventilated area free of combustible materials, gasoline, flammable solvents or vapors
  • Ensure a clearance of at least 600mm (or as per manufacturer’s recommendations) on all sides of generator to allow sufficient ventilation for cooling vents
  • Always operate in a clean, dry and well-ventilated area
  • Ensure fire protection equipment accessible as required
  • Ensure spark-arrester muffler installed.

Do not run a diesel/petrol-powered generator inside a building (e.g. shed), or where ventilation is limited.

Ensure:

  • Generators are not accessible to the general public (provide fencing / barricades and signage)
  • Unit grounded as per manufacturer’s instructions
  • All tools/appliances are suitable to use with generator
  • Operating manual for the generator is available onsite

All operators are aware of how to shutdown unit in an emergency.

6.
7.

Hazards Present

  • Fire / explosion.
  • Hazardous atmospheres
  • Electric shock / electrocution

Risk Control Measures

Ensure location is suitable for generator:

  • Clear of ignition sources
  • Ensure unit is able to be placed in safe location clear of flammables goods
  • Always operate generator in a well-ventilated area free of combustible materials, gasoline, flammable solvents or vapors
  • Ensure a clearance of at least 600mm (or as per manufacturer’s recommendations) on all sides of generator to allow sufficient ventilation for cooling vents
  • Always operate in a clean, dry and well-ventilated area
  • Ensure fire protection equipment accessible as required
  • Ensure spark-arrester muffler installed.

Do not run a diesel/petrol-powered generator inside a building (e.g. shed), or where ventilation is limited.

Ensure:

  • Generators are not accessible to the general public (provide fencing / barricades and signage)
  • Unit grounded as per manufacturer’s instructions
  • All tools/appliances are suitable to use with generator
  • Operating manual for the generator is available onsite

All operators are aware of how to shutdown unit in an emergency.

Order with confidence

As Australia's leading SWMS provider, we guarantee your SWMS to be legally compliant and job ready.

Instant download

Industry leading simple and easy SWMS documents. Simply find the document you need, complete the checkout and have the documents instantly.

Work activities & risks

We have hundreds of pre-filled SWMS with work activities and risks for instant download. Use our self-serve download if you know which document you need or contact a specialist to build a complete compliancy package.

Australian support

Need help? Please call our dedicated support number to speak with a SWMS specialist. If outside of business hours, please use our contact form.

Word & PDF documents

Each SWMS is delivered instantly to your email in both the customised PDF and original MS Word format to allow the flexibility of any changes.

Customised logo

Look professional by having your company's logo shown. Simply upload your logo in the checkout process to complete the customisation.

What you’ll need

Having helped thousands of businesses, we've made getting compliant extremely easy.

Know which SWMS you need

Our growing self-serve SWMS library is designed to help businesses build compliance quickly.

Your business name

We connect with ABR.gov.au to help make it easier to fill out your business information.

Your logo to upload

Add your logo to the SWMS documents and look professional.

Easy to follow instructions

Our documents are designed to be easy to use. Here's a preview of just how simply it is.

See what our customers say

Helping Australian businesses solve WHS compliance quickly and easily.

24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
Previous
Next

Need help?

If your SWMS requires special conditions as part of a tender, you need our Full Compliance Solutions See our Full Compliance

Our SWMS are used on these Tier-1 sites

Instant quote

Fill out your information

Instant quote

Electrical (Temporary Connections) SWMS

Download this customised SWMS document in 5 minutes.