Electrical (Lightning and General Power Cable Install) SWMS

Save time with this 2019 compliant Ready To Sign SWMS document that’s been pre-filled with work activities and risks.

Electrical (Lightning and General Power Cable Install) SWMS

Download this customised SWMS document in 5 minutes.

Electrical (Lightning and General Power Cable Install)

Word + PDF

Full 12 Month

Change Guarantee

What’s included

Below is a preview of just one of many work activities included in this SWMS document.

WORK ACTIVITIES

1.
2.
3.
4.
5.Install Power and Light Cable

Hazards Present

  • Manual handling – strains sprains and back injuries
  • Electrocution
  • Slips, trips and falls
  • Fall from heights

Risk Control Measures

  • Make sure live parts do not come into contact with bare conductors;
  • Make sure cables near live parts are effectively insulated;
  • Make sure ends of cables near live parts are restrained;
  • Use correct lifting techniques, lifting equipment and rotate tasks;
  • Train workers in the correct techniques for the task;
  • Train workers in the correct use of the equipment;
  • Train workers in the correct use of the equipment and supervise until they demonstrate they can operate the tool safely
  • Make sure work area is kept clear and suitable lighting is available;
  • Check equipment is in good condition and placed on stable ground;
  • Always wear appropriate footwear, hardhats when working below work at heights, and a fall arrest devise when working at heights;
  • Wear gloves when handling sharp objects;
  • Make sure the connections to the switchboard are made when it has been confirmed dead. Use the Safety Controls for Test for de-energized in this SWMS
6.
7.

Hazards Present

  • Manual handling – strains sprains and back injuries
  • Electrocution
  • Slips, trips and falls
  • Fall from heights

Risk Control Measures

  • Make sure live parts do not come into contact with bare conductors;
  • Make sure cables near live parts are effectively insulated;
  • Make sure ends of cables near live parts are restrained;
  • Use correct lifting techniques, lifting equipment and rotate tasks;
  • Train workers in the correct techniques for the task;
  • Train workers in the correct use of the equipment;
  • Train workers in the correct use of the equipment and supervise until they demonstrate they can operate the tool safely
  • Make sure work area is kept clear and suitable lighting is available;
  • Check equipment is in good condition and placed on stable ground;
  • Always wear appropriate footwear, hardhats when working below work at heights, and a fall arrest devise when working at heights;
  • Wear gloves when handling sharp objects;
  • Make sure the connections to the switchboard are made when it has been confirmed dead. Use the Safety Controls for Test for de-energized in this SWMS

Order with confidence

As Australia's leading SWMS provider, we guarantee your SWMS to be legally compliant and job ready.

Instant download

Industry leading simple and easy SWMS documents. Simply find the document you need, complete the checkout and have the documents instantly.

Work activities & risks

We have hundreds of pre-filled SWMS with work activities and risks for instant download. Use our self-serve download if you know which document you need or contact a specialist to build a complete compliancy package.

Australian support

Need help? Please call our dedicated support number to speak with a SWMS specialist. If outside of business hours, please use our contact form.

Word & PDF documents

Each SWMS is delivered instantly to your email in both the customised PDF and original MS Word format to allow the flexibility of any changes.

Customised logo

Look professional by having your company's logo shown. Simply upload your logo in the checkout process to complete the customisation.

What you’ll need

Having helped thousands of businesses, we've made getting compliant extremely easy.

Know which SWMS you need

Our growing self-serve SWMS library is designed to help businesses build compliance quickly.

Your business name

We connect with ABR.gov.au to help make it easier to fill out your business information.

Your logo to upload

Add your logo to the SWMS documents and look professional.

Easy to follow instructions

Our documents are designed to be easy to use. Here's a preview of just how simply it is.

See what our customers say

Helping Australian businesses solve WHS compliance quickly and easily.

24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
Previous
Next

Need help?

If your SWMS requires special conditions as part of a tender, you need our Full Compliance Solutions See our Full Compliance

Our SWMS are used on these Tier-1 sites

Instant quote

Fill out your information

Instant quote

Electrical (Lightning and General Power Cable Install) SWMS

Download this customised SWMS document in 5 minutes.