WORK ACTIVITIES

1.
2.
3.
4.
5.House Raising

Hazards Present

  • Adverse weather – hot, cold, windy, wet
  • Domestic animals, insects etc.
  • Biological hazards (fungus, moulds, wood rot etc, soil contaminants)
  • Electricity – Energized electrical equipment / installation
  • Hazardous Chemical – single exposure (Diesel, lubricants)
  • Static electricity
  • Asbestos
  • Hazardous atmosphere
  • Slippery / uneven surface
  • Objects / obstructions on ground
  • Falling objects, loss of load
  • Noise
  • Fluids under pressure
  • Mobile plant
  • Vehicles
  • Pedestrians

Risk Control Measures

Ensure:

  • Sufficient room for delivery of materials
  • Located away from traffic/vehicles/pedestrians (develop appropriate traffic management plan – include physical barriers, caution signs, etc.)
  • Located clear of overhead electric lines. Ensure no work is conducted within No Go Zones of overhead electric lines unless de-energized and evidence is obtained from the power supplier on on-going isolation.

Ensure site is suitable for works to begin. Example:

  • No persons inside dwelling
  • Vegetation cleared
  • Property protected where required
  • Excess water removed
  • Contaminants cleared/removed
  • Dangerous animals cleared/removed
  • Utilities repaired if required, de-energized and marked / protected from accidental damage
  • Suitable weather conditions. Do not proceed in low-light, inclement weather or high winds
  • All required materials are available onsite.
6.
7.

Hazards Present

  • Adverse weather – hot, cold, windy, wet
  • Domestic animals, insects etc.
  • Biological hazards (fungus, moulds, wood rot etc, soil contaminants)
  • Electricity – Energized electrical equipment / installation
  • Hazardous Chemical – single exposure (Diesel, lubricants)
  • Static electricity
  • Asbestos
  • Hazardous atmosphere
  • Slippery / uneven surface
  • Objects / obstructions on ground
  • Falling objects, loss of load
  • Noise
  • Fluids under pressure
  • Mobile plant
  • Vehicles
  • Pedestrians

Risk Control Measures

Ensure:

  • Sufficient room for delivery of materials
  • Located away from traffic/vehicles/pedestrians (develop appropriate traffic management plan – include physical barriers, caution signs, etc.)
  • Located clear of overhead electric lines. Ensure no work is conducted within No Go Zones of overhead electric lines unless de-energized and evidence is obtained from the power supplier on on-going isolation.

Ensure site is suitable for works to begin. Example:

  • No persons inside dwelling
  • Vegetation cleared
  • Property protected where required
  • Excess water removed
  • Contaminants cleared/removed
  • Dangerous animals cleared/removed
  • Utilities repaired if required, de-energized and marked / protected from accidental damage
  • Suitable weather conditions. Do not proceed in low-light, inclement weather or high winds
  • All required materials are available onsite.

Order with confidence

As Australia's leading SWMS provider, we guarantee your SWMS to be legally compliant and job ready.

Instant download

Industry leading simple and easy SWMS documents. Simply find the document you need, complete the checkout and have the documents instantly.

Work activities & risks

We have hundreds of pre-filled SWMS with work activities and risks for instant download. Use our self-serve download if you know which document you need or contact a specialist to build a complete compliancy package.

Australian support

Need help? Please call our dedicated support number to speak with a SWMS specialist. If outside of business hours, please use our contact form.

Word & PDF documents

Each SWMS is delivered instantly to your email in both the customised PDF and original MS Word format to allow the flexibility of any changes.

Customised logo

Look professional by having your company's logo shown. Simply upload your logo in the checkout process to complete the customisation.

What you’ll need

Having helped thousands of businesses, we've made getting compliant extremely easy.

Know which SWMS you need

Our growing self-serve SWMS library is designed to help businesses build compliance quickly.

Your business name

We connect with ABR.gov.au to help make it easier to fill out your business information.

Your logo to upload

Add your logo to the SWMS documents and look professional.

Easy to follow instructions

Our documents are designed to be easy to use. Here's a preview of just how simply it is.

See what our customers say

Helping Australian businesses solve WHS compliance quickly and easily.

24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
24 Oct, 2018
shanep415
Awesome to deal with. Very helpful and great value for money.
Previous
Next

Need help?

If your SWMS requires special conditions as part of a tender, you need our Full Compliance Solutions See our Full Compliance

Our SWMS are used on these Tier-1 sites

Instant quote

Fill out your information

Instant quote

Carpentry (Stumping) SWMS

Download this customised SWMS document in 5 minutes.